Overview

A groundbreaking architecture
project setting new global standards

Scope of work: Design, manufacture and supply of façades.

Located in Jersey City, New Jersey, 88 Regent is a striking 32-story development envisioned as a gateway to Downtown. The building will offer 392 rental apartments, 9,110 sq. ft. of ground-floor retail space, and over 5,000 sq. ft. of office space. A multi-level garage with over 300 parking spaces will be integrated within the structure, hidden from view to maintain the building’s sleek aesthetic. The building’s corner will be rounded, creating a welcoming public plaza that seamlessly connects to the lobby and retail areas, and provides easy access to the nearby Hudson Bergen Light Rail station. Offering breathtaking views, 88 Regent is designed to enhance its surroundings, providing a modern, iconic identity for Liberty Harbor North and becoming the neighborhood’s most desirable address.

Technical details

Brief insights
about the project

Unitised Cladding System

The tower uses a unitised cladding system with integrated top-hung windows, fixed glazing, and PTAC louvers, designed to withstand harsh winter and summer hurricane conditions.

Certified Structural & Thermal Calculations

Structural, thermal, and acoustic calculations were reviewed and verified by a certified engineering office in New York to meet the project’s specifications.

Parallel Production & Fabrication

Production, fabrication, and assembly were conducted simultaneously, with a non-stop operation that shipped 200 containers from Dubai to New Jersey in three months.

Optimized Delivery & Installation

Materials were delivered on schedule with elements numbered in sequence, ensuring smooth installation and avoiding any delays on-site.

Cost-Efficient Design & Installation

Designs were optimized to reduce installation costs and facilitate a quicker erection process, making it more cost-effective for the project.

Accelerated Construction Cycle

By synchronizing production and assembly, the construction cycle was accelerated, ensuring the project was completed on time and within budget.